The Smart Maritime Group has won a tender to supply a thickening tank to Yuzhniy Mining and Processing Works.

The project will start in March. Its cost will amount to 175 million UAH.

The designer of the thickener is Engineering Dobersek GmbH (Germany).

The total weight of the metal structure with 3 tanks of 10.9 meters is 2012.6 tons.

In 2017 SMG manufactured 317 million UAH worth of goods. (Ukrainian metal)

Leave a Reply