In 2017 the gold-extracting company Pavlik obtained 6.5 tons of gold in 2017, up 1.7-fold, or by 66.7%.
In 2016 at the Pavlik deposit the company mined 3.9 tons of gold.
This year the company intends to obtain 7 tons of gold.
The gold-extracting factory at the Pavlik deposit was commissioned in August 2015. In 2016 it reached its full capacity of 4 million tons of ore per year (8 tons of gold). (Ukrainian metal)