Zaporizhstal has put in operation its hydrochloride etching line in the cold-rolling shop No. 1 after a major overhaul.
According to the company statement, the repair lasted for 7 days and cost some 35 million UAH.
At the same time the company has also repaired the Tandem-1680 mill in the shop with investments at 14 million UAH.
The hydrochloride etching line was commissioned in 2014. (Ukrainian metal)