In Q3 Metalloinvest produced 10 million tons of iron ore concentrate and sinter ore, down by 0.9% QoQ, mostly because of scheduled repairs.

Pellets output totaled 6.3 million tons, up by 0.9% QoQ.

HBI manufacture dropped by 4.8% QoQ, to 1.7 million tons, because of the repair of HBI complexes Nos. 1 and 2 at LGOK.

Pig iron output in July-September totaled 0.7 million tons, down by 3.4% QoQ, due to the repair at UralStal.

Steel manufacture went up by 6.7%, to 1.2 million tons, as the scheduled repairs at OEMK were completed in Q2. (Ukrainian metal)

Leave a Reply