On September 25 the capital repairs of the Karabashmed chemical and metal works will start.
The scheduled repairs will be carried out in three shops: metal, sulfur acid and power shop.
The repairs are expected to last for 25 days.
The metal shop will get two new Kumera converters with the volume of 150 tons each.
The cost of the repair is some 2.3 billion rubles. (Ukrainian metal)