The advisor to the minister of energy and coal industry Maxim Bilyavsky reported that the purchase of pipes for the construction of interconnector would start in autumn.

Ukrtransgaz and Gaz-System (Poland) have signed an agreement to construct a gas pipeline between the countries.

The length of the pipeline will be 99.3 km, and the project cost – $245 million. (Ukrainian metal)

Leave a Reply