Ural Steel, a part of Metalloinvest, has in advance finished the scheduled capital repair of the furnace shop casting machine No. 3.
The shop operates 5 casting machines. Each of them undergoes an overhaul every three years according to the schedule. Repairmen have 30 days to conduct all the work. (Ukrainian metal)