The state committee has put into operation a new long face at the Pavlogradskoye Mine Group with enough coal for 1.5 years.
The long face length is 270 meters, it is capable of yielding 2 thousand tons of coal daily.
The group still has to mine 178 thousand tons of coal to reach its annual target. It also plans to put two new long faces into operation. (Ukrainian metal)