Blast furnace 3 at the Yenakievo Iron and Steel Works (EMZ) in Ukraine will be the first hearth in Ukraine with a GrafTech refractory hearth.
The EMZ plant has 3 blast furnaces. 3 is a 9.1 m diameter furnace with 2 tapholes and stave cooled hearth and bosh. The GrafTech lining includes a GradeD carbon block bottom with NMA and NMD HotPressed brick hearth walls and tuyere band. (SteelGuru)