In September, Sukha Balka commissioned a new manufacturing capacity in the Mine named after Frunze.

The block is situated at the depth of 1200 meters. Iron ore reserves amount to 45 thousand tons with high iron content (62.9%).

The work was performed by the miners of the site No. 21. Mining will be carried out by the site No. 6. (Ukrainian metal)

Leave a Reply