ArcelorMittal Kriviy Rih has repaired the bulk materials supply tract gallery in the converter shop.

The length of the gallery, through which pass the conveyers Nos. 3 and 3a, transporting lime, dolomites and coal from the depth of 2 meters to 32 meters, is 216 meters.

The repair lasted for almost a year. 145 tons of metal structures were produced and assembled. (Ukrainian metal)

Leave a Reply