The Ministry of Economy has allowed the Ukrainian Metallurgical Plant Design Institute to conclude an agreement to design the construction of a forging and banding complex in Ekibastuz, Kazakhstan for $840 thousand.
The design was ordered by Astana Kala Kurylys.
The cost of the work was more than 10% Ukrgipromez assets value, so the enterprise addressed the ministry in January. (Ukrainian metal)