Metinvest has started supplying metal for the active stage of construction of the first “steel building” in Ukraine in Mariupol.

Azovstal intends to provide over 330 tons of steel structures, with around a hundred to be delivered until the end of May.

The frame of the building will be made of metal structures, while the walls will be of ferroconcrete.

The size of the building will be over 7 thousand square meters. It will have 120 flats. (Ukrainian metal)

Leave a Reply