VSMPO-Avisma has begun constructing a new shop No. 22.
Its size will be over 10 thousand square meters.
The premises will house mills for mechanical treatment of titanium stampings (discs and rings).
The first metal structures will arrive this month. Until April 2020 the frame of the building will have been erected.
In summer the building will receive foundation for machinery. (Ukrainian metal)