Baikalrud LLC, developing the Noion-Tolgoyskoye deposit in Zabaikalye region, intends to reach its design capacity of 3 million tons of ore by 2025.

The enterprise will be producing 812.7 thousand tons of zinc concentrate and 624.6 thousand tons of lead concentrate per year.

The capacity of the processing factory is 1 million tons of ore per year.

At present the company is designing a quarry and the second processing factory with the capacity of 2.2 million tons.

In 2017 Baikalrud produced 21.6 thousand tons of lead and 36.3 thousand tons of zinc. (Ukrainian metal)

Leave a Reply