In January-March, Chukotka Autonomous District mined 110 thousand tons of coal, down by 40% YoY.
The decrease has to do with the scheduled drop in mining at the Fandyushkinskoye deposit.
In 3 months Beringpromugol LLC, operating at the deposit, mined 76.9 thousand tons of coal, down by 45% YoY.
The second coalminer – Shakhta Ugolnaya – decreased output at the Anadyr deposit by 14%, to 33.1 thousand tons. (Ukrainian metal)