Lebedinsky Mining and Processing Works has put into operation a new excavator with improved capacity with the ladle volume of 20 cubic meters.
This is the third machine of the kind operating at LGOK.
It takes the excavator 3 minutes to fully load a 220-ton BelAZ.
The weight of the machine is over 700 tons. (Ukrainian metal)