In 2018 the Razrez Stepnoy pit, a part of Russkiy Ugol, mined over 4.2 million tons of coal in Khakasia.

3.4 million tons were processed at the factory.

The pit employs over 1 thousand locals.

The enterprise was founded in 1993.

In more than 25 year of operation it has mined over 63 million tons of power-generating coal, processing some 24.5 million tons. (Ukrainian metal)

Leave a Reply