The city of St. Petersburg has carried out a large-scale infrastructure project on construction of a third stage of the water pipelines.

The cost of the project was 3.3 billion rubles.

The pipes of the high quality pig iron produced by Svobodniy Sokol were used for the construction.

Altogether 30 km of pipes have been laid. (Ukrainian metal)

Leave a Reply