Raspadskaya has commissioned a new 4-10-31 long face with the reserves of 3.5 million tons of coal.

The length of the long face is over 3.5 km.

Average monthly output is expected at 180 thousand tons at first, and 250-300 thousand tons in a few months.

The long face will be developed for 18 months. (Ukrainian metal)

Leave a Reply