The mine named after Stashkov (DTEK Dneprovskoye Mine Group) has put into operation a new breakage face.

This is the second long face prepared for operation this month.

The reserves of the long face 5023 are over 250 thousand tons of coal.

The long face will be in development till the end of the year.

The length of the face is 176 meters. The yield is expected at 1150 tons of coal per day.

Since the start of the year the mine group has commissioned three long faces. This year 5 more long faces will be put into operation. (Ukrainian metal)

Leave a Reply