In March Almalyk Iron and Steel Works started construction of the roasting furnace No. 4 in the rare metals shop of the copper smelting works.
The shop operates 3 furnaces with the capacity of 1800 tons of molybdenum product per year.
Another furnace will increase molybdenum product processing by 30% per year. (Ukrainian metal)