In January-June the average delivery time of ferrous scrap to metal companies by Russian Railroads totaled 5.1 days, up by 17.2% YoY.

At the same time for the batches not exceeding 260 tons (77% of all shipments) the delivery time was 5.37 days, up by 17.7% YoY.

The batches of more than 1 thousand tons saw the lowest change (+1.4%). (Ukrainian metal)

Leave a Reply