Ingulets Mining and Processing Works has repaired the electric locomotive OPE1-AM No. 33.

According to the company CEO Alexander Gerasimchuk, the locomotive was repaired at the Tbilisi Locomotive-building Pant (Georgia). Now the engineers are assembling the roof equipment.

Soon the locomotive will resume operation.

“This will allow us not only to increase the rock transportation volumes, but also provide for safe passage along the railroad”, Gerasimchuk noted. (Ukrainian metal)

Leave a Reply