Highland Gold Mining Ltd has selected a company to design the processing factory at the Kekura deposits in Chukotka.

According to the company statement, this is Spb-Gyproshakht LLC.

This year HGM plans to start construction of infrastructure at the deposits. In 2019 Kekura will be connected to the grid.

The JORC resources of the deposit are estimated at 2 million ounces of gold with the contents of 7 g per ton. (Ukrainian metal)

Leave a Reply