In February Dneprospetsstal produced 21031 tons of steel and 14055 tons of rolled metal, both up by 2.1% and by 1.7% MoM respectively.

The combined cost of goods manufactured in February reached 784306 thousand UAH, up by 0.5% MoM.

In 2 months the company produced 41623 tons of steel and 27874 tons of rolled metal, up by 3.5% and by 1.7% YoY respectively. The cost of the goods was 1564878 thousand UAH, up by 27.9% YoY. (Ukrainian metal)

Leave a Reply