In 2017 Uralelectromed produced 44 tons of tellurium with the purity of 99.95%, up by 2.5% YoY.
Moreover, for the first time the company produced 130 kg of 99.999% tellurium.
UEM commissioned the tellurium production site in 2013.
The cost of the project was 105 million rubles. (Ukrainian metal)