In January ore output of the open-pit at the Osenneye deposits of Gaysky Mining and Processing Works totaled 94.6 thousand tons with the target being 74 thousand tons.

From underground the GOK mined 677 thousand tons of ore, up by 0.3% from the target.

The factory processed 853690 tons of ore. Copper concentrate output was 7849 tons, and zinc concentrate – 471 tons. (Ukrainian metal)

Leave a Reply