The state commission has put into operation a new long face at the Zapadno-Donbasskaya mine. This is the second long face commissioned at the Ternovka Mine Group this year.
It will provide the miners with work until April 2019, allowing them to obtain 800 thousand tons of coal.
The length of the long face is 292 meters. The daily output is expected on the level of 1900 tons of coal.
DTEK invested 74 million UAH into the long face. (Ukrainian metal)