Revda Non-Ferrous Metals Processing Works has received the first 3 of 8 trawlers with bulk parts of SMS Group (Germany) pressing line.

The parts have been traveling for some 30 days.

To unload the bulk parts of the press a special crane with the lifting capacity of 250 tons has been ordered. The heaviest part of the lot weighs 30 tons. (Ukrainian metal)

Leave a Reply