Pavlogradskoye Mine Group intends to mine 4 million tons of coal this year.

To reach this goal the enterprise needs to prepare a new long face as fast as possible.

The shaftmen of the Pavlogradskaya mine have been working at the increased level for several months, and have already exceeded scheduled monthly results.

At such a pace the new long face will be ready in September. (Ukrainian metal)

Leave a Reply