The Dneprovsky Iron and Steel Works sintering factory has resumed operation.
According to the company technical director Konstantin Nesvet, in the first day the factory produced 2 thousand tons of sinter and kept putting sintering machines into operation.
DMK has also put its blast furnace N1M into operation, as all the raw materials have been previously delivered.
Supplying of water to all shops is underway. Works on the gas pipeline at the gas shop have been complete. (Ukrainian metal)