Ruspolymet (Kulebaki, Nizhniy Novgorod region) has put into operation the second electroslag remelting furnace with the volume of 14 tons.

The construction of two furnaces started in February 2016.

The first furnace was put into operation in November 2016. The furnaces are used to produce ingots of structural high-alloyed heat-resistant steels and alloys with the total weight of 14 tons. The main consumers are pipe works. (Ukrainian metal)

Leave a Reply