The Apollo metal structures works (Samara) has finished delivering structures for the booster compressor plant at the Sharkiy Berdakh oil-and-gas deposits (Uzbekistan).
The company has supplied cable rack and pillars for units. The weight of the structures totaled 171 tons.
The Sharkiy Berdakh is being developed by Uzbekneftegaz, which is constructing the booster compressor plant with the capacity of 18 mW there. (Ukrainian metal)