Chelyabinsk Iron and Steel Works, a part of Mechel, produced 1 million tons of rolled metal at its rail and structural mill since it was put into operation.

The 1 millionth-ton was the rail for the Russian Railroads.

ChMK started supplying 100-meter rails to RZhD in January 2016. Last year the works delivered around 304 thousand tons of rails to is clients.

The rail and structural mill at ChMK was put into operation in 2013. (Ukrainian metal)

Leave a Reply