Altynken works, built at the Taldy-Bulak deposits and valued at $285 million is still not operating.
When the assembly works started the constructors found out that the copper content in the gold ore was higher than expected. So, Dore alloy can be extracted from only one third of ore, with the rest being copper.
At present the company is looking for the technique to finish construction. (Ukrainian metal)