For Ukrainian TPPs to be able to work in normal mode during the winter season they need enough energy-generating coal. That is why DTEL Pavlogradugol has increased mining output at all of its mine groups in Q3 by 21%.
Ternovskoye Mine Group yielded 1 million tons of coal, up by 27% QoQ, Pershotravenskoye – 1 million tons, up by 41%, Pavlogradskoye – 1 million tons, up by 30%, named after Space Heroes – 1.2 million tons, up by 8.2%, and Dneprovskoye mined 655 thousand tons of coal, up by 6.6% QoQ.
In January-September DTEK Energo mined 20.6 million tons of coal, with 16.7 million tons yielded by DTEK Pavlogradugol. (Ukrainian metal)