ArcelorMittal Kriviy Rih has finished capital repairs of the heating furnace of the 250-3 mill in the section-rolling shop #1.
The repaired furnace will be able to heat steel billets on all sides.
The investments into the overhaul totaled $1.2 million. The average capacity of the mill is 1800 tons of rolled metal per day. (Ukrainian metal)