ArcelorMittal Kriviy Rih has finished capital repairs of the heating furnace of the 250-3 mill in the section-rolling shop #1.

The repaired furnace will be able to heat steel billets on all sides.

The investments into the overhaul totaled $1.2 million. The average capacity of the mill is 1800 tons of rolled metal per day. (Ukrainian metal)

Leave a Reply