Zaporizhstal to repair sintering machine No. 4
At present the equipment delivered to the sintering plant is being unloaded. Preparation for capital repair of sintering machine No. 4 is at full speed. 75% of the 400 tons of metal structures and large sized units has been manufactured. The foundry, mechanical and metal structure shops are finishing the fulfillment of the orders and…