In 2017 Evraz NTMK produced 1.3 thousand tons of flanged beams for metal structures to be used in construction of Amur Gas-Processing Works infrastructure.

This year the deliveries will continue.

In particular Evraz NTMK produced beams of 19 sizes, including of low-alloyed steel 345.

The company can manufacture 300 sizes of hot-rolled beams with the length of 6 to 24 meters. (Ukrainian metal)

Leave a Reply