ArcelorMittal Kriviy Rih has repaired loading railway tracks Nos. 3 and 4 in the sinter shop No. 1.

Because of its age and wear, the site was a bottleneck in the shop. This resulted in suspension of the sintering machines’ operation, as the produced sinter had to be immediately loaded and sent for further use.

Around 350 meters of railroad were repaired in the shop. (Ukrainian metal)

Leave a Reply