The Pokrovskoye Mining Group is building a new block No. 11.

In particular, the ore transportation complex is being prepared that will unload trolleys with ore from the mine. The operator’s unit and foundation for machinery will be prepared in June.

The assembly of 100 tons of metal structures will take around 6 months. (Ukrainian metal)

Leave a Reply