AzerGold CJSC held an open tender for stripping, mining and transportation of rocks at the Chovdar ore processing site from the Chovdar field within the sulfide phase of development.

The tender was also held for grinding oxide rocks from the Aghyokhush, Mereh and Chovdar fields.

AzerGold CJSC signed a contract worth 72.9 million manats ($42.8 million) with Star Mining LLC for the performance of the mentioned operations. (AzerNews/Ukrainian metal)

Leave a Reply