Novokramatorskiy Machine-building Works has produced 8 ball mills with the central unloading at the order of the Yuzhniy Mining and Processing Works.

5 mills have already been shipped and are being assembled. Three more are being prepared for shipping.

Due to their special construction, the mills will increase the processing factory capacity by 10%.

8 more ball mills are being produced by NKMZ for UGOK. (Ukrainian metal)

Leave a Reply