ArcelorMittal Temirtau has launched all of its three oxygen converters with the volume of 300 tons after repair.
Now the shop operates at full capacity.
The converter No. 2 started operating in early January, and then converter No. 1 was shut down for repair, which lasted for 100 days.
Since February 9, the shop has been operating with one converter only, as converter No. 3 needed to be repaired. On February 21, the converter resumed operation. (Ukrainian metal)