Uralelectromed has produced elevator parts to transport people and rock into the mine.
The order came from miners developing the Korbalikhinskoye deposit in Altai region.
The parts are made of angles with the length of 12 meters and the size of 200×200 mm.
So far UEM has produced three batches of parts.
Until December the company will send 16 more batches – 747 parts with the combined weight of 883 tons. (Ukrainian metal)