Uralelectromed under a project to construct a new sulfur acid shop has laid foundation, erected building frame and 3 tanks of 45 cubic meters each.
The size of the warehouse will be 750 square meters. It will house 3 tanks to store sulfur acid and a pump unit consisting of 5 pumps.
Two of them will be used to load sulfur acid from railroad tank cars, and the other three to distribute it to the shop via pipelines.
The technological machinery is expected to be delivered next month.
The warehouse will be commissioned in December. After that the old sulfur acid warehouse will be disassembled. (Ukrainian metal)