Aktyubinsk Copper Company has purchased new special machinery to develop the Vesenne-Aralchinskoye deposit.
The batch comprises 7 dump trucks, 3 loaders and 2 drilling rigs.
The lifting capacity of the loaders is 10 tons, and of the trucks – 20 tons.
The deposit is situated both on the territory of Kazakhstan (southern part) and Russia (northern part).
The Kazakh part of the deposit will be commissioned in mid-2019, and the design capacity will be reached in 2020. (Ukrainian metal)