Chelyabinsk Iron and Steel Works has produced flanged beams for the construction of the first station of Kazan subway second line.

The second line will have 12 stations. It will unite 5 city districts. Its length will be around 20 km.

The hot-rolled beams have been produced at the rail and beam shop of ChMK’s own raw materials. (Ukrainian metal)

Leave a Reply