Mechel-Service has supplied 1.3 thousand tons of rolled metal for the construction of a bridge over the Pur River between the Urengoy hamlet and the Korotchayevo district in the Yamalo-Nenets Autonomous District.

Rebars manufactured by the Chelyabinsk Iron and Steel Works constituted the major part of the batch,

The length of the bridge will be 1.7 km. (Ukrainian metal)

Leave a Reply